Skip to main content
:::
::: Home >> Case Report >> Case Detail

County-level Chinghua Junior High School



Sustainable Campus Partial Renovation Project (Stage 2) In addition to reducing or even halting energy use to alleviate the greenhouse effect, we can also replace high-carbon energy sources with low-carbon or carbon-free ones. For this purpose, our school has set up a central utility room for water filtering and recycling and developed a plan to improve the wiring of classroom light fixture switches and the sunshade structure. Contract price: NT$960,000 Major steps: 1. Setting up a central utility room for water filtering and recycling 2. Rewiring classroom light fixture switches 3. Improving the exterior shade structure
school location

Profile

  • County-level Chinghua Junior High School
  • System: High school
  • Report year: 2016
  • Area: Middle Taiwan
  • County: Hsinchu