Skip to main content 
:::
::: Home >> Case Report >> Case Detail

County-level Chinghua Junior High School

!



       Sustainable Campus Partial Renovation Project (Stage 2) In addition to reducing or even halting energy use to alleviate the greenhouse effect, we can also replace high-carbon energy sources with low-carbon or carbon-free ones. For this purpose, our school has set up a central utility room for water filtering and recycling and developed a plan to improve the wiring of classroom light fixture switches and the sunshade structure. Contract price: NT$960,000

Major steps:

       1. Setting up a central utility room for water filtering and recycling

       2. Rewiring classroom light fixture switches

       3. Improving the exterior shade structure
County-level Chinghua Junior High School 01 County-level Chinghua Junior High School 02
County-level Chinghua Junior High School 03 County-level Chinghua Junior High School 04
school location

Profile

  • County-level Chinghua Junior High School
  • System: High school
  • Report year: 2016
  • Area: Middle Taiwan
  • County: Hsinchu