County-level Chinghua Junior High School
!
Sustainable Campus Partial Renovation Project (Stage 2)
In addition to reducing or even halting energy use to alleviate the greenhouse effect, we can also replace high-carbon energy sources with low-carbon or carbon-free ones. For this purpose, our school has set up a central utility room for water filtering and recycling and developed a plan to improve the wiring of classroom light fixture switches and the sunshade structure.
Contract price: NT$960,000
Major steps:
1. Setting up a central utility room for water filtering and recycling
2. Rewiring classroom light fixture switches
3. Improving the exterior shade structure

Profile
- County-level Chinghua Junior High School
- System: High school
- Report year: 2017
- Area: North Taiwan
- County: Taoyuan