Skip to main content 
:::
::: Home >> Case Report >> Case Detail

Jhongyi Elementary School

!



    To better use our school spaces and limited resources, we decided to put the sustainable campus project into three categories, which covers eight items: Energy Recycling !V energy reduction and low emission We collected rainwater from Chi-Sheng Building (|U﹐t?O) and Ming-Lung Building (cu-U?O), then reused the water for toilet flushing.

Permeable Paving
    On the south side of Cheng Kung Well (|‥¥\??) ground, we lay out some grass paving with plastic paving grids and gravel. Insulation & ventilation We installed a ventilation duct from Chi-Sheng Building!|s (|U﹐t?O) administrative zone to its roof. As for the southern old windows on the first and second floors, we changed them into push windows and put some exterior sun blinds on them. Also, we added some shutters to Chi-Sheng Building!|s (|U﹐t?O) east and west windows.
Jhongyi Elementary School01 Jhongyi Elementary School02
Jhongyi Elementary School03 Jhongyi Elementary School04
school location

Profile

  • Jhongyi Elementary School
  • System: Elementary
  • Report year: 2012
  • Area: South Taiwan
  • County: Tainan